On September 21, 2018, the Secretary of Public-Private Partnership (the “SPPP”) has made available in its website, the preliminary tender terms (the “Preliminary Tender Terms”) for the first-high voltage power transmission lines under a new public-private partnership (“PPP”) scheme. The awardee will be selected as contractor (the “PPP Contractor”), who will undertake the construction and further operation and maintenance of the 500 kV high-voltage line, the future substations Río Diamante and Charlone, and complementary works (the “Project”).

The preliminary PPP Agreement (the “PPP Agreement”), the Preliminary Tender Terms and its appendixes contain the main characteristics of the Project as of September 21, 2018.

The awarded bidder will execute a PPP Agreement for a total fifteen-year term. The PPP Agreement comprises (i) a construction period (the “Construction Period”), for the term comprised within its execution and commercial operation date (“COD”), term that may not exceed the maximum a term of thirty-six (36) months; and (ii) further to COD, an operation and maintenance services period (the “O&M Period”), up to the fifteenth (15) year as from its execution.

The Project’s total compensation –CAPEX and OPEX– (the “Required Total Amount”) will be due and payable by means of (i) investment payment titles (“TPI”, for its Spanish acronym) equivalent to 90% of the Required Total Amount, and (ii) a residual compensation (the “Residual Compensation”) equivalent to 10% of the Required Total Amount. Both will be issued and paid by and individual PPP Trust (Fideicomiso Individual PPP Transmisión Eléctrica and hereinafter, the “PPP Trust”), which will be constituted specifically for the Project and in order to manage issuance and payments due to the PPP Contractor. For specifics about this matter, please refer to point 9 below.

The Argentine government, through the Secretary of Government of Energy (the “SGE”), currently under the Ministry of Treasury, shall provide funding to the PPP Trust by yearly budgetary contributions. The PPP Trust will also receive those funds collected by the Compañía Administradora del Mercado Mayorista Eléctrico S.A. (“CAMMESA”), related to charges under Resolution No. 1085/17 of the former Secretary of Energy.

The relevant authorities in relation to the Project are: (i) the SGE, as convening authority of the tender, and (ii) Integración Energética Argentina S.A. (the “Contracting Entity”), successor of former Energía Argentina S.A. (“ENARSA”).

Schedule, final terms and conditions of the tender are yet still to be defined. A consultation period and a deadline for the tender of bids will be specified in such schedule.

It should be noted that, due to the preliminary nature of the documents and the fact that the SPPP will be publishing complementary information regarding the Project, the information contained herein may be updated in the future and therefore, subject to further modifications In this respect, we will be closely following this process and inform any relevant updates as soon as possible.

The most relevant aspects of the Preliminary Tender Terms are summarized below:

1) Selection process

The selection process of the PPP Contractor will be implemented through a two-stage national and international tender procedure.

2) Main rules

The main legal rules and documents to be considered regarding the Preliminary Tender Terms are comprised by the following: (i) Law No. 27,328 and its regulatory Decree No. 118/2017; (ii) Law No. 27,431, which approved the national budget for the current 2018 year; (iii) the 2019 period national budget law1; (iv) the PPP Agreement; (v) the agreement and rules of the Law 27,431 PPP Trust; (vi) the Trust Agreement; (vii) Trust joinder agreement; (viii) Resolution No. 1/2017 issued by the SPPP; (ix) Resolution No. 1/2018, issued by the SPPP; and (x) specific regulations of the electricity regulatory framework, such as (a) Laws No. 15,336 and 24,065; (b) their regulatory decrees (i.e., Decrees No. 1398/1992 and 186/1995), and (c) the Procedures for Programming the Operation, the Dispatch and Calculation of Prices, approved by the former SEE Resolution No. 61 dated April 29, 1992, as amended and supplemented to date.

3) Tender documents

The final tender terms and conditions will be published by the SPPP. Clarifying circular letters (circulares aclaratorias) may be issued upon queries of the bidders, which shall be performed no less than fifteen (15) days as from the date set forth as deadline for bid submission.

4) Bidders

  • Legal capacity: bidders may accredit their legal capacity by any of the following: (i) having an address in the Republic of Argentina; (ii) having its principal place of business in the Republic of Argentina; or (iii) being dully registered as a branch.
  • Limitations: the same legal entity or may not integrate different bidders. However, a bidder may be integrated by two or more legal entities or persons, in which case they will be held as jointly and severally liable vis-à-vis the SGE.
  • Corporate purpose and term: the corporate purpose of those legal entities acting as bidders or members of a bidder must allow their performance as bidders and, subject to being awarded, PPP Contractor. The term of these legal entities must be, for at least three (3) years greater than the total duration of the PPP Agreement.
  • Restrictions: certain restrictions are set forth in the tender documents (i.e., corporation matters, anti-corruption).
  • National component: minimum thresholds for national component are mandatory.
  • Minimum capital stock: the PPP Contractor must subscribe a capital stock of at least 0,1% of the Required Total Amount as follows:
    1. 25%, concurrently with the execution of the PPP Agreement.
    2. 50%, at the sixth (6) month anniversary as from the execution of the PPP Agreement.
    3. 75%, at the twelfth (12) month anniversary as from the execution of the PPP Agreement.
    4. Outstanding balance, at the eighteenth (18) month anniversary as from the execution of the PPP Agreement.
  • Prior to the execution of the PPP Agreement, the awarded bidder must incorporate the PPP Contractor as a sociedad anónima, which will act as a sole purpose vehicle.

5) Reference and alternative projects

The reference project comprises the design, construction, expansion, maintenance and operation of the Project, in accordance to the technical specifications, which must be complied with by the PPP Contractor. These are attached as Appendixes V, VI, VII, VIII, IX and X (the “Reference Project”).

Bidders must expressly indicate if they adopt the Reference Project or if they propose alternatives, in which case they must include a detail of their alternative project (the “Alternative Project”). Alternative projects must comply with the minimal technical requirements which are attached to the Preliminary Tender Terms as Appendix V.

If an Alternative Project fails to comply with the Preliminary Tender Terms’ minimal technical requirements or if the Alternative Project fails to obtain CAMMESA’s approval, the PPP Contractor must adopt the Reference Project with the same Annual Fee (as such term is defined below) than the one offered for the Alternative Project.

6) Bid formalities

Bids must be submitted in original or certified copies.

Bidders must submit the following documents:

  • Envelope No. 1: this envelope shall include the technical bid, which is comprised of (i) legal documents regarding the bidder and its legal capacity; (ii) documents which prove technical capacity and bidder’s track record, and (iii) documents which prove financial capacity of the bidder.

    With respect to the documents mentioned in point (ii), the bidder shall comply with the following requirements:

    1. Background on construction of high-voltage lines and substations:
      Requirements Acceptable minimum
      i. Civil works and mechanical and electromechanical assembly and erection of power transmission lines and of substation projects, which operate with a voltage equal or higher than 500 kV, with metallic structures, including control, protection and telecommunications systems, in the last twenty (20) years. – Length of high-voltage lines of no less than two-hundred and fifty (250) kilometers
      – 1 substation
      – 1 project in the last ten (10) years
      ii. Civil works and mechanical and electromechanical assembly and erection of substation projects, which operate with a voltage equal or higher than 500 kV, with metallic structures, in the last twenty (20) years. – Length of high-voltage lines of no less than two-hundred and fifty (250) kilometers.
      – 1 substation
      – 1 project in the last ten (10) years

    2. Background on provision of operation and maintenance services for high-voltage lines and substations:
      Requirements Acceptable minimum
      i. Power transmission lines and substations which operate with a voltage equal or higher than 500 kV maintenance, in the last twenty (20) years. Five (5) years
      ii. Power transmission lines and substations which operate with a voltage equal or higher than 500 kV operation, in the last twenty (20) years. Five (5) years

    3. Design engineering background:
      Requirements Acceptable minimum
      i. Preparation of electric studies and projects for 500 kV facilities One project of at least two-hundred and fifty (250) kilometers

      Bidders must submit a copy of those contracts or certificates issued by their contracting parties, for compliance with these standards.

      With regards to those requirements indicated in point b) above, the Preliminary Tender Terms do allow subcontracting as a way to comply with those minimum standards.

  • Envelope No. 2: this envelope must include the economic bid, which must be submitted using the forms attached in Appendix IV of the Preliminary Tender Terms.

    The economic bid must indicate a specific amount of an annual fee in US dollars (the “Annual Fee”)2. Preference will be granted to the bidder who bids the lowest Annual Fee.

7) Guarantees

Pursuant to the Preliminary Tender Terms, the following guarantees are mandatory and therefore required: (i) a bid bond, (ii) a financial close bond, and (iii) a main works bond.

Such guarantees must be constituted by the PPP Contractor in favor of the SGE as first-demand guarantees and may be constituted as (i) a bank deposit, (ii) a bank guarantee, and/or (iii) a stand-by letter of credit.

  • Bid bond:
    1. Amount: fifteen-million US dollars (US$ 15,000,000).
    2. Requirements: if bidders are integrated by more than one legal entity, the bid bond must be issued by the bidder’s controlling shareholder.
    3. Execution: the SGE shall be entitled to execute the bid bond in the event that (i) a bidder withdraws its bid in advance; (ii) a bidder forges information; (iii) the PPP Agreement is not executed; or (iv) a bidder fails to issue the main works bond or the financial close bond in accordance with the PPP Agreement.
    4. Term: one-hundred and twenty (120) days as from tender submission with automatic term renewal.
    5. Return: upon execution of the PPP Agreement and submission of the financial close bond and main works bond.
  • Financial close bond:
    1. Term: as from execution of the PPP Agreement and achievement of financial close.
    2. Initial amount: 2% of the Required Total Amount.
    3. Increases: if the financial close is not achieved by the PPP Contractor within the term of six (6) months since the PPP Agreement is executed, the PPP Contractor must increase the financial close bond in a 2.25% of the Required Total Amount for TPI. If financial close is not achieved within the term of nine (9) months, the financial close bond must be increased in a 2.75% of the Required Total Amount for TPI.
    4. Execution: the Contracting Entity may execute the financial close bond in the event that (a) the PPP Contractor does not achieve financial close upon the committed date (considering extensions); and/or (b) the PPP Contractor does not extend or renew the financial close bond.
  • Main works bond:
    1. Term: as from execution of the PPP Agreement once year further to COD.
    2. Initial amount: the amount of the main works bond shall be equal to: (a) as from the execution of the PPP Agreement, 2.5% of the Required Total Amount for TPI; and (b) from the financial close until one (1) year after the Project’s COD, to 4.5% of the Required Total Amount for TPI.
    3. Increases: the main works bond may be subject to renewals and increases in the event of late COD.
    4. Execution: the Contracting Entity may execute the main works bond in case that (i) the PPP Contractor is fined under the PPP Agreement and such penalty is not paid in due time; (ii) the PPP Contractor fails to compensate the Contracting Entity for liquidated damages related to the execution of the Project; (iii) the PPP Contractor fails to pay any charges or penalties owed to the Contracting Entity if the PPP Agreement is terminated prior to its maturity date; (iv) the PPP Contractor fails to pay any amounts which are determined by recommendation of a technical board or an arbitral award in favor of the Contracting Entity; or (v) the PPP Agreement is terminated by justified decision by the Contracting Entity.

8) Transmission companies

The Preliminary Tender Terms provide that in case TRANSENER S.A. or TRANSBA S.A. are awarded as PPP Contractor, as applicable, they will be not entitled to collect he supervision fee that the PPP Agreement establishes. Project’s supervision will be defined in a future tender process to be carried out by the SGE.

9) PPP Contractor’s payment scheme

TPIs will be issued by the PPP Trust during the Construction Period on a quarterly basis, pursuant to the actual works progress. Monthly investment advancement acts (“ARAI”) will be executed. TPIs shall be considered mature on the forty-two (42) month anniversary of the PPP Agreement’s execution date and will be payable on twenty-four (24) semi-annual payments.

With respect to the Residual Compensation, it shall be due and payable as from the Project’s COD monthly. Invoices for the corresponding Residual Compensation shall be issued by the PPP Contractor and delivered to the Contracting Entity. The PPP Trust will pay those invoices within fifteen (15) days.

  • Both TPIs and the Residual Compensation will be nominated in US dollars and shall be deemed as fixed, unconditional, irrevocable and transferable, without the Contracting Entity’s prior consent.
  • Non-timely TPIs will accrue interests to a rate equivalent to two-hundred (200) points above the performance of bonds ARG2026, ARG2027 and ARG2028N.
  • As TPIs are issued in accordance with the main works’ progress, the PPP Contractor will benefit itself with a speedy execution of the works under the Project.

10) Dispute resolution

  • Amicable negotiations: the PPP Agreement sets forth an initial stage of amicable negotiations in case there are any disputes between the parties. This initial stage has a period of thirty (30) days.
  • Technical board: once the thirty (30) day period of amicable negotiations expires, a technical board must intervene and issue a recommendation.
  • Arbitration:
    1. Requirements: if the technical board does not issue a recommendation in the term of ninety (90) days, any party may submit the dispute to arbitration.
    2. Venue: venue shall be in the City of Buenos Aires, unless: (i) the dispute is not quantifiable; (ii) the value under dispute exceeds the sum of ten-million US dollars (US$ 10,000,000); or (iii) the controlling shareholder is not Argentine. Upon any of those circumstance, the seat of arbitration may be in the City of Buenos Aires or in a member state of the Convention on the Recognition and Enforcement of Foreign Arbitral Awards (New York, 1958).
    3. Composition: the arbitral tribunal shall be composed of three (3) members when the dispute is not quantifiable or when the value under dispute is equal or higher to ten-million US dollars (US$ 10,000,000). If the value under dispute is less than ten-million US dollars (US$ 10,000,000), the arbitral tribunal shall be composed of one (1) member.
    4. Nationality: the president of the arbitral tribunal shall not be national to any of the parties nor to any controlling shareholder with a direct or indirect participation higher than 10% of the PPP Contractor.

11) Risk matrix

A preliminary risk matrix has been made available, whereby the Project’s risks are allocated either to the PPP Contractor or to the Contracting Entity, as the case may be. Such risk matrix indicates that the PPP Contractor shall bear, inter alia, (1) power-line easement-associated risk, pursuant to Law No. 19,552; (2) COD risk; (3) environmental risk. As for the Contracting Entity, it shall bear: (1) demand risk; and (3) exchange variation risk.


We are available to provide clarifications or further information of any matter addressed above.

*****

1. Currently, such bill as proposed by the National Executive is under review in the National Congress of the Republic of Argentina.
2. The Annual Fee is the PPP Agreement awarding variable and represents a sum equal to the twelfth part of the Required Total Amount.